MGS
Manufacturing (Germantown, WI) is in need of additional clean room
manufacturing space at their All West Plastics facility in Antioch, IL.
Haag Müller, Inc. performed a site assessment of the property to determine
the largest addition possible, taking into account current zoning, storm
water detention, and building code requirements. Combined with these
requirements was the need to either work around an existing ingress/egress
easement, or to seek an abandonment of the easement. MSG is currently
assessing their specific needs, relative to the addition scenarios
presented, and will be narrowing down the direction of the project scope.